The objective is: 
1467.68
The running time is: 
1229.19
The time meeting best is: 
1164.35
Location: 6(load: 426) 
 Route 0(load: 142) 91 85 81 32 70 80 3 16 49 89 
 Route 1(load: 145) 47 44 45 23 4 18 82 13 73 
 Route 2(load: 139) 99 68 24 17 48 40 76 39 52 
Location: 7(load: 567) 
 Route 0(load: 150) 2 19 78 29 92 27 46 14 10 31 
 Route 1(load: 140) 77 7 56 6 83 58 71 72 9 
 Route 2(load: 128) 38 20 79 95 25 61 54 11 97 
 Route 3(load: 149) 74 59 62 66 87 21 57 12 36 43 
Location: 9(load: 524) 
 Route 0(load: 150) 0 63 98 28 69 50 64 55 22 53 
 Route 1(load: 105) 1 35 30 26 84 67 93 
 Route 2(load: 122) 15 8 33 90 41 86 65 37 
 Route 3(load: 147) 88 51 5 75 42 94 60 96 34 
The actual cost is 1467.68
